The job order: how it differs from a harbour maneuver
A harbour job has one port and one berth; an offshore job has a port of departure (or base) and a port of destination. What is served is not always a ship either: a barge, a rig or a platform is towed. Such an object may have no gross tonnage, so the job order carries the type and name of the object instead of GT.
The duration is not known in advance, but it is estimated: the expected duration is written on the job order. That number keeps the tug from being booked on another job on those days, and it is the measure that shows the job is running long. Once the job starts its status is “in progress” and stays that way until it ends.
- Port of departure / base and port of destination
- Object towed: ship, barge, rig, platform
- Expected duration written on the job order
- Status: planned → in progress → completed