WATCH SCHEDULE

Watch schedule — table of shipboard working arrangements (Excel)

STCW A-VIII/1 §5 and MLC A2.3 §10 require the shipboard working arrangements to be posted in the working language and in English in an easily accessible place. This template follows Table 1 of the IMO/ILO guidelines: scheduled hours per rank at sea and in port.

Excel (.xlsx)EnglishFree

For the master and safety officer; the office keeps a copy.

What is in the file?

  • Header: ship, IMO, flag, latest update, mode (at sea / in port), applicable limit and its basis
  • One row per rank or person: watchkeeping and non-watchkeeping hours at sea and in port (from–to)
  • Daily total work and rest columns (at sea / in port) and comments
  • Example sheet: a filled table for 13 ranks — three-watch system at sea, six-hour watches in port
  • Master signature and date box; filling notes on a separate sheet; landscape print

FREE DOWNLOAD

Get the template

Fill in the short form and the download opens immediately.

Watch schedule (shipboard working arrangements) · Excel (.xlsx) · Free

WATCH SCHEDULE

How to use it

  1. 01

    List the ranks

    A generic row (“2nd Officer”) or a row per person.

  2. 02

    Enter the time ranges

    As “04:00–08:00, 16:00–20:00”; non-watchkeeping duties in their own column.

  3. 03

    Check the totals

    Rest = 24 − work. A row below 10 hours makes the schedule non-compliant.

  4. 04

    Sign and post it

    Issue a new version when watch arrangements change; keep the old one.

Where this sheet stops

The schedule is a plan; it does not record actual hours or compare plan with actual. Keep a separate file per mode (at sea / in port).

Draft the schedule on board, see it in the office.

In Pelastra an officer drafts the watch schedule and the master publishes it; the office exports PDF (TR+EN). Each person’s daily record is suggested from the schedule with “fill from plan”, and the deviation report compares plan and actual.

Frequently asked questions

Is the watch schedule the same as the hours of rest record?

No. The schedule shows the plan and is posted; the record keeps actual hours per person per day. Both are required; the record template is also on this site.

Which language should it be in?

The working language of the ship and English. The template is in English; if the working language is different, add a translation next to the headers.

Do I need a separate schedule in port?

If port work differs from sea work, yes; tick the mode box in the header and prepare a separate copy.